Hydro Power is Renewable and Clean
Energy |
| v |
Kerala State experienced shortage of
power due to increase in demand and stalemate in
growth of generation capacity |
| v |
The Kerala Government has allotted the
following small hydro power projects to SSPML |
|
|
Palchuram
Project
|
: |
5.25 mw |
|
Alamparathode
Project
|
: |
3.00 mw |
|
Mukkuttathode
Project
|
: |
3.00 mw |
|
Total |
: |
11.25 mw |
|
| v |
All Projects are located at North
Kerala |
| v |
Hydrology Reveals Steady Rainfall |
| v |
Minimal Forest Area Involved |
| v |
Eligible for Subsidy and Carbon Credit |
| v |
The projects have been allotted on BOOT
basis for a period of 30 years |
| v |
All are Run of River Projects |
| v |
The power generated can be either sold
to KSEB on the basis of power purchase agreement or
can be sold to others |
| v |
Three Separate companies registered as
implementation companies |
|
|
Sree
Kailas Palchuram Hydro Power Ltd
|
|
Sree
Adisakthi Mukkuttathode Hydro Power Ltd
|
|
Jalashaayi
Alamparathode Hydro Power Ltd
|
|
| v |
SSPML has control in the composition of
the Board of Directors of the above companies and
SSPML will be in the position of Holding Company |
| v |
The Present board of the SPV companies
comprises the directors of SSPML |
| v |
 |
 |
Project formulated at Palchuram
stream |
 |
Palchuram stream is tributary
of Bavelipuzha, which is also a tributary to
Valapattanam river. |
 |
The weir site is located in
Tea-estate area. |
 |
Scheme being designed as a
run-of-the the river project, major geological
problems are not expected |
|
|
| v |
 |
 |
Project formulated at
Alamparathodu stream |
 |
Alamparathodu stream is
tributary of Kuttiyadi river |
 |
Head fall of about 200 meters |
 |
Absence of deforestation |
 |
An environmental friendly
Project |
|
|
| v |
 |
 |
Formulated to utilize the water
flowing in the stream Mukkuttuthodu |
 |
One of the tributaries of
KUPPAM River |
 |
No dwelling houses need to be
rehabilitate |
 |
Absence of deforestation |
 |
An environmental friendly
Project |
|
|